Client: Azərneftyağ Production Association
Location: Baku, Nobel Avenue
Start date: 2001
Implementation period: 8 months
Scope of work: Manufacturing and installation of metal structures. The total weight is 1500 tons.
Installation of 4 tanks with a capacity of 5000 m3, installation of pumps and pipelines in the area of the 11th workshop.